Close Menu
    Facebook X (Twitter) Instagram
    Tuesday, September 15
    Facebook X (Twitter) LinkedIn VKontakte
    Talk Sport UG
    • Home
    • African Football
    • International Football
    • Uganda Premier League
    • Others
    Talk Sport UG
    Home»The Latest»Hoima Metropolis Stadium Contractors to return to web site for added works – The Panorama Uganda
    The Latest

    Hoima Metropolis Stadium Contractors to return to web site for added works – The Panorama Uganda

    March 31, 2026No Comments2 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Hoima Metropolis Stadium Contractors to return to web site for added works
    Share
    Facebook Twitter LinkedIn Pinterest Email

    David GOMBE

    The State Minister for Sports activities Peter Ogwang has confirmed that the contractors (SUMMA) of Hoima Metropolis Stadium will return to the positioning following issues from the CAF inspection crew report final month.

    In accordance with the report, Hoima Metropolis Stadium required an operational redesign. Regardless of having a accomplished construction and operational, a number of main operational deficiencies have been recognized.

    David GOMBEThe State Minister for Sports activities Peter Ogwang has confirmed that the contractors (SUMMA) of Hoima Metropolis Stadium will return to the positioning following issues from the CAF inspection crew report final month.

    “We invited CAF to evaluate our stadiums at Namboole and Hoima Metropolis, and we due to this fact acknowledge the issues raised within the report. To date, the Hoima contractor has agreed to return to web site.” Stated Ogwang

    Ogwang additionally revealed that the federal government is not going to pay extra cash for the extra works.

    “What folks should recognize is that the contract was watertight, and in all this, the Authorities of Uganda is not going to pay extra cash for the extra works at Hoima Stadium required to adjust to the CAF report.” He acknowledged

    He additionally confirmed that FUFA was a part of the development of the Stadium, working hand in hand with Nationwide Council of Sports activities

    “It’s not true that FUFA has not been a part of the development of Hoima Metropolis Stadium, and I’m reliably knowledgeable that the Nationwide Council of Sports activities has been facilitating FUFA to go and supervise this facility.” Stated Ogwang

    CAF revealed the important thing points that must be addressed at Hoima Metropolis Stadium earlier than the subsequent inspection due in August this 12 months.

    The important thing points recognized are;

    *Absence of clear segregation between spectator classes;
    *Cross-circulation between media, VIP, groups and common spectators;
    Non-compliant referee dressing rooms;
    *Non-compliance of gamers’ dressing rooms;
    *Media amenities beneath AFCON requirements;
    *Blended zone incorrectly positioned throughout the competitors space;
    *Restricted operational buffer house as a result of stadium’s geographical location.
    *Present place of the benches inflicting a significant view obstruction from the stands.

    added Contractors Hoima Metropolis Panorama return site Stadium Uganda web works
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    World Athletics Championships 2029: London misses out on bid to Nairobi

    September 15, 2026

    Enzo Maresca: How Man City manager is tackling the toughest job in football

    September 15, 2026

    Leeds 4-1 Newcastle: Is ‘unplayable’ Calvert-Lewin in line for England recall?

    September 15, 2026
    Leave A Reply Cancel Reply

    You May Also Like

    World Cancer Day: Testing protocol for prostate cancer is ‘alarming’, says Shaka Hislop

    February 4, 2026

    T20 Women’s World Cup: Why 2026 tournament matters so much to England and English game

    June 12, 2026

    Bryon Okuba replaces Ram Mpuuga as energy and conditioning coach at SC Villa – The Panorama Uganda

    July 10, 2026

    Australian Open 2026: Jessica Pegula ends Madison Keys title defence and wins apple pie bet

    January 26, 2026

    Lindsey Vonn third at Val d’Isere for third podium finish in four World Cup races

    December 20, 2025

    Hoima Metropolis Stadium Contractors to return to web site for added works – The Panorama Uganda

    March 31, 2026
    © 2026 - Talk Sport UG.
    • Home

    Type above and press Enter to search. Press Esc to cancel.

    Ad Blocker Enabled!
    Ad Blocker Enabled!
    Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.